上海水磨iso

Beijing Metro Global Resort Station welcomes guests

  Original title: Rail Transportation Bus High Speed ??has two direct access to the resort pressure test travel demand Metro Global Resort Station, welcoming the reporter from the Municipal Communications Commission, in order to meet the traffic travel requirements during the internal pressure test during the Beijing Global Resort, Today, the rail transit Global Resort Station officially opened the trial operation; the bus No. 589, T1松江哪里有服务 16 road has extended to the Global Resort today; Tian Jiafu Station, Jingha Expressway, Zhangjiawan North Railway Station, two highways The entry and exit port has been enabled on August 20. Outbound 7 minutes to the resort Entrance Rail Transit Global Resort Station is the supporting construction project of Beijing Global Resort, which is the exchange station and terminal station of the eight-way line Nanta, No. 7 online. The end of 2020 has opened a trial operation. condition.

Today, start with the internal pressure test in Beijing Global Resort, open the trial operation.

The first bus time of the station 7 is 5:09, the last bus time is 22:29; the first bus time of the eight pass line is 5:12, the last bus time is 22:52.

After the subway line 1 and the eight-way line realize cross-line operations, passengers can take a direct access from the ancient city station to the Global Resort Station.

  There are 6 entrances and entrances in the Hall of the Global Resort Station. Tourists can get on the Entrance to the Beijing Global City Avenue for about 7 minutes from B, C, and D. The station floor is the station floor, the underground layer is the station layer, with a total construction area of ??4,7184 square meters. The station is the double island station, the north side is the 7th line platform, the south side is the eight-way platform, the platform effective width is 16 meters, and the two lines are transferred through the shared station.

  Beijing Metro Co., Ltd. said that after the internal pressure test, trial operation and grand opening of the Global Resort, the subway station will focus on Strengthening the Organization and Division of North Square, especially for the characteristics of tourists in the evening tourism, strengthen security, ticketing, and gates. The promotional guidance personnel of the area ensure the order of passenger flow. During the epidemic prevention and control, Beijing Metro will strictly implement various epidemic prevention and control measures. I hope that the majority of passengers will wear masks during the subway, do personal protection, encounter a lot of passengers, and listen to the command, safety of staff in the station. Order travel.

  Two bus lines extend the operation line Beijing bus group, extended the first car, the T116 operation line, serving the bus travel needs around the Global Resort. 589 Road (疃 疃 公交 站 – Global Resort), adds the East Exit of Yelu East, East Global Avenue (Open to Yuli Bus Station), Global Resort.

Operation time is a bus station 5: 10-22: 20, Global Resort 5: 30-22: 50. T116 Road (the North Exit of Daxiezhuang Road – Metro Station), and the "Diqiao Bus Station" is canceled two-way.

The operating range is extended by the Duqiao Bus Station to the North Exit of Da Gao Lizhuang Road (high-rise golden village). The vehicle is issued by the northern exit of Dashazhuang Road. It is through the Daergent Road, Yu Rui East Road, Global Avenue, Xuqi Road, Resort North Street, Jiutu Road, Wansheng South Street, Yunjing East Road, Cloud Jingnan Street, Jiutu East Road to Diqiao Hun Village, along the T116 Road, Zhiyuan Road to Metro Station; from the Subway Yucheng Station, along the T116 Road, Zhaoxin Village, Jingshu East Road , Yunjing South Street, Yunjing East Road, Wan Sheng South Street, Jiutu Road, Resort North Street, Xingqi Road, Global Avenue, Yu Ruidong Road, Qunfang South Street to High-rise Golden Village. Operation time, the North Exit of Da Gao Lizhuang Road 5: 30-22: 00; Metro Yucheng Station 6: 00-22: 00. From now on, the 589 Road, T102 Road, T112 Road "Qunfang South Street Station" is renamed "Subway High House Gold Station".

  The new exit of the Jinghali Ring Road is convenient for tourists to self-driving directly to the park. The Jingha Expressway and the East Sixth Ring have set up intersection and access and exit. Two two sites direct to Beijing Global Resort.

Currently, both toll boots are enabled.

  Introduction to the first group, the Jingha Expressway, the Jingha Expressway is located in the Jingha Expressway and the west side of the West Side of Jiu Tree Road. It has now realized the full direction of local road network, and the vehicle can enter and exit the park through special ramps. . Six-Ring Road Interchange Project is located in the East Six Ring Road and Xiao Taihou Henan Street, which is the import and export of the Six-Ring Road to the Global Resort.

At present, the public can drive from the inner 上海洗浴桑拿论坛rings of the East Six Ring Road and enter and out of the global resort (from northward, south). The outer ring direction (from Nanjin, north) has been included in the Eastern Sixth Ring Engineering Synchronous Construction, and is currently in construction, it is expected to be completed next year. (Beijing Daily reporter Sun Hongyang).